FMC Technologies

Project description

FMC Technologies Brighton is a 52,000 SF single-story pre-engineered metal office building with manufacturing areas as well as associated site work. The project’s 19-acre site is located in Brighton, CO on Weld County Road 27.  The manufacturing areas include work areas for Flowback, Surface Wellhead, and Fluid Control as well as paint spray booths, test cells, and a drive-through wash bay.

FMC Technologies Odessa is a 49,000-sf two-story tilt-wall office building with warehouse and manufacturing areas with a 5,000-sf stand alone building for manufacturing and vehicle maintenance. The manufacturing areas include work areas for Flowback, Surface Wellhead, and Fluid Control as well as paint spray booths, test cells, and a drive-through wash bay.

FMC Technologies in San Antonio is a 57,335 SF single story pre-engineered metal office building with manufacturing areas as well as associated site work. The manufacturing areas include work areas for Flowback, Surface Wellhead, and Fluid Control as well as paint spray booths, test cells, and a drive-through wash bay.